Effluent monitoring · live
--

Process view — Sunrise Textile Processing · ETP Unit 2

Normal

Last 24 hours

Recent alarms

all →

Alarm log

Limits are demo values (CPCB-style general standards)
Raised (IST)ParameterConditionPeak valueLimitState

Compliance report

ParameterLimitMinAverageMaxMinutes over limit

Download CSV

Field unit (RTU)

Online

Connectivity

Field unit reports over Wi-Fi / GSM using MQTT with TLS, with HTTPS as a fallback.

  • Offline buffering with automatic back-fill after reconnect
  • Over-the-air firmware updates
  • Per-unit authentication keys
  • Configurable sampling and reporting interval