Process view — Sunrise Textile Processing · ETP Unit 2
NormalLast 24 hours
Recent alarms
all →Trends
Alarm log
Limits are demo values (CPCB-style general standards)| Raised (IST) | Parameter | Condition | Peak value | Limit | State |
|---|
Field unit (RTU)
OnlineConnectivity
Field unit reports over Wi-Fi / GSM using MQTT with TLS, with HTTPS as a fallback.
- Offline buffering with automatic back-fill after reconnect
- Over-the-air firmware updates
- Per-unit authentication keys
- Configurable sampling and reporting interval
Effluent monitoring · live